Solution Description
CZPT MC Series Strong Shaft Parallel Shaft CZPT for CZPT CZPT
MC.H Series Parallel Shaft CZPT
MC.B Series Appropriate Angle CZPT
Apps:
Crushing, Mixing, Creating Supplies, Lifting, Bulk Content Dealing with, Chemical, Meals Processing, Wooden, Paper, and Environmental Defense CZPT.
Installation:
Mounting Type: Horizontal Mounting, Vertical Mounting, Upright Mounting
Set up Method: Foot Mounted, Torque Arm Mounted
Detailed Images
Parts:
one. Housing:
CZPT Iron Box
2. Gears:
Hardened CZPTcal Gears (MC.H Collection Parallel Shaft CZPT)
Hardened CZPTcal Bevel Gears (MC.B Collection Right Angle CZPT)
three. Shafts:
Parallel Shafts (MC.H Series)
Orthogonal Shafts (MC.B Collection)
Output Shaft: Sound Shaft, Hollow Shaft
four. Modular Accessories:
Shrink Disk, Mounting Flange, Motor Flange, Cooling Admirer, Torque Arm, CZPT Enter Shaft
Versions:
Total 8 Model Measurements: MC02 ~ MC09
Characteristics:
one. Optional mounted by any a single aspect of six sides.
two. Compact structure, light weight.
three. Rigid welded box framework, weighty responsibility and substantial load capability.
four. Modular scheme and design and style for special circumstances, adapting to the diverse requirements.
five. two stage or three stage drive gearbox.
Lubrication:
Selecting the suitable lubrication approach according to the lubricating oil degree.
Lubrication technique:
Splash lubrication – Minimal oil stage (Horizontal Mounting)
Immersion lubrication – Higher oil degree (Vertical Mounting, Upright Mounting)
Solution Parameters
Input Power | 7.05 KW-1066 KW |
Output Velocity | 15.five-267.one rpm |
Output Torque | 8000 N.m-66000 N.m |
Transmission Ratio | 7.1-112 |
Transmission Stage | two-three Stage |
Packaging & Shipping and delivery
Organization Profile
Our Positive aspects
Our Providers:
Pre-sale solutions | one. Decide on equipment product. |
2.Style and manufacture merchandise in accordance to clients’ unique need. | |
three.Train technological personalized for clientele | |
Solutions in the course of promoting | 1.Pre-check and accept merchandise in advance of shipping. |
2. Support consumers to draft resolving strategies. | |
Following-sale companies | 1.Support clients to prepare for the initial construction scheme. |
2. Practice the initial-line operators. | |
three.Get initiative to eliminate the difficulty swiftly. | |
4. Give technological exchanging. |
FAQ