B Jxj Series Foot Mount Gearbox

B Jxj Series Foot Mount CZPT

CZPTshine CZPT Cycloid Geared Motor Characteristics

one. Characteristics:
1. Smooth working,minimal sound equipment tooth needle far more engagement.
2. Cycloidal tooth profile offers a substantial speak to ratio to stand up to overload shocks
three. Compact dimension: solitary ratio CZPT from one/9 to one/87, double phase up from 1/99 to one/7569 
four. Best for dynamic apps: recurrent start off-end-reversing duties fits for cyclo velocity reducer given that inertia is low
5. Decrease servicing costs: higher dependability, lengthy daily life, nominal maintenance compared to conventional gearboxes
six. Inner elements replaceable with other brands to guarantee working.

7. Grease Lubricated & Oil Lubricated Models Obtainable
eight. Output Shaft Rotation Path: Single Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
9. Ambient Circumstances: Indoor Installation:10-40 Celsius, Max 85% Humidity, Below 1000m Altitude, Well Ventilated Setting, Cost-free of corrosive,        explosive gases, vapors and dust
ten.Slow Pace Shaft Route: Horizontal, Vertical Up & Down, CZPT Route
11.Mounting Design: Foot Mount, Flange Mount & Vertical F-flange Mount,
12. Enter Connection: Cyclo Integral Motor, Hollow Input Shaft Adapter
thirteen. Coupling Approach With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
14. Cycloid reducer Ability Variety: .37kW ~ 11kW

two. CZPT parameters

Sort Aged Variety Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned military mould company, was proven in 1965. CZPTshine specializes in the full energy transmission resolution for higher-end tools producing industries based mostly on the intention of “Platform Merchandise, Software Design and style and Professional Provider”.
CZPTshine have a robust specialized pressure with in excess of 350 staff at existing, which includes over thirty engineering experts, 30 high quality inspectors, masking an spot of 80000 square meters and varieties of CZPTd processing machines and tests equipments. We have a very good foundation for the market application advancement and service of large-stop pace reducers & variators possessing to the provincial engineering technological innovation investigation center,the lab of equipment velocity reducers, and the foundation of contemporary R&D.

Our Team

Quality Handle
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
product is a product inspection to determine the qualified products.

seven. Certification.

Packing

Shipping and delivery

 

B Jxj Series Foot Mount CZPT