B Jxj Series High Overload Capacity Gearbox

B Jxj Series High Overload Capacity CZPT

CZPTshine CZPT Cycloid Geared Motor Attributes

one. Features:
1. Smooth working,lower sound equipment tooth needle far more engagement.
two. Cycloidal tooth profile supplies a large get in touch with ratio to face up to overload shocks
3. Compact dimensions: one ratio CZPT from 1/9 to one/87, double stage up from 1/99 to one/7569 
4. Ideal for dynamic programs: regular start-cease-reversing obligations satisfies for cyclo speed reducer considering that inertia is reduced
5. Reduce maintenance expenses: higher trustworthiness, lengthy daily life, minimum upkeep compared to traditional gearboxes
6. Internal areas replaceable with other brands to make certain working.

7. Grease Lubricated & Oil Lubricated Versions Available
8. Output Shaft Rotation Direction: One Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
9. Ambient Problems: Indoor Set up:ten-forty Celsius, Max 85% Humidity, Underneath 1000m Altitude, Well Ventilated Environment, Free of charge of corrosive,        explosive gases, vapors and dust
ten.Sluggish Speed Shaft Direction: Horizontal, Vertical Up & Down, CZPT Route
eleven.Mounting Type: Foot Mount, Flange Mount & Vertical F-flange Mount,
12. Input Link: Cyclo Integral Motor, Hollow Enter Shaft Adapter
thirteen. Coupling Approach With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
fourteen. Cycloid reducer Ability Assortment: .37kW ~ 11kW

two. CZPT parameters

Variety Old Sort Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned navy mould enterprise, was proven in 1965. CZPTshine specializes in the total power transmission remedy for high-stop gear manufacturing industries primarily based on the purpose of “Platform Item, Software Layout and Skilled Provider”.
CZPTshine have a powerful technological power with over 350 workers at present, which includes above thirty engineering experts, thirty quality inspectors, covering an area of 80000 square meters and kinds of CZPTd processing equipment and testing equipments. We have a excellent foundation for the sector application improvement and support of large-end pace reducers & variators owning to the provincial engineering engineering study centre,the lab of equipment velocity reducers, and the base of modern R&D.

Our Staff

Top quality Manage
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
item is a product inspection to determine the qualified products.

7. Certification.

Packing

Shipping and delivery

 

B Jxj Series High Overload Capacity CZPT

Tags: gearbox