B Jxj Series Single Reduction Gearbox

B Jxj Series Single Reduction CZPT

CZPTshine CZPT Cycloid Geared Motor Traits

one. Characteristics:
one. Smooth managing,lower noise gear tooth needle a lot more engagement.
two. Cycloidal tooth profile gives a higher get in touch with ratio to endure overload shocks
three. Compact dimension: one ratio CZPT from 1/9 to one/87, double stage up from 1/99 to one/7569 
four. Excellent for dynamic apps: frequent start-stop-reversing responsibilities suits for cyclo speed reducer given that inertia is low
5. Lessen upkeep fees: substantial reliability, prolonged daily life, small upkeep when compared to conventional gearboxes
six. Internal elements replaceable with other manufacturers to ensure managing.

seven. Grease Lubricated & Oil Lubricated Types Accessible
8. Output Shaft Rotation Route: Solitary Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
nine. Ambient Situations: Indoor Set up:10-forty Celsius, Max eighty five% Humidity, Beneath 1000m Altitude, Nicely Ventilated Atmosphere, Cost-free of corrosive,        explosive gases, vapors and dust
10.Gradual Pace Shaft Course: Horizontal, Vertical Up & Down, CZPT Route
11.Mounting Fashion: Foot Mount, Flange Mount & Vertical F-flange Mount,
12. Enter Relationship: Cyclo Integral Motor, Hollow Input Shaft Adapter
13. Coupling Technique With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
14. Cycloid reducer Capability Variety: .37kW ~ 11kW

two. CZPT parameters

Variety Previous Sort Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned army mould business, was established in 1965. CZPTshine specializes in the full energy transmission answer for large-stop tools production industries based mostly on the goal of “System Item, Software Style and Skilled Service”.
CZPTshine have a strong specialized pressure with over 350 workers at existing, including over thirty engineering specialists, 30 high quality inspectors, covering an location of 80000 square meters and varieties of CZPTd processing devices and screening equipments. We have a great basis for the market application advancement and service of substantial-conclude velocity reducers & variators possessing to the provincial engineering engineering study heart,the lab of gear speed reducers, and the foundation of modern R&D.

Our Crew

Top quality Manage
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
solution is a product inspection to determine the qualified products.

7. Certification.

Packing

Shipping and delivery

 

B Jxj Series Single Reduction CZPT