CZPTshine CZPT Cycloid Geared Motor Attributes
one. Characteristics:
one. Smooth operating,reduced sounds gear tooth needle far more engagement.
2. Cycloidal tooth profile supplies a high speak to ratio to withstand overload shocks
three. Compact dimension: one ratio CZPT from one/9 to 1/87, double phase up from 1/99 to 1/7569
4. Perfect for dynamic applications: recurrent begin-quit-reversing duties fits for cyclo velocity reducer considering that inertia is low
5. Minimize upkeep fees: high trustworthiness, extended existence, minimum maintenance when compared to standard gearboxes
six. Inner elements replaceable with other makes to make sure working.
seven. Grease Lubricated & Oil Lubricated Models Accessible
eight. Output Shaft Rotation Route: Solitary Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
nine. Ambient Situations: Indoor Installation:ten-40 Celsius, Max eighty five% Humidity, Underneath 1000m Altitude, Nicely Ventilated Environment, Totally free of corrosive, explosive gases, vapors and dust
ten.Slow Speed Shaft Course: Horizontal, Vertical Up & Down, CZPT Route
eleven.Mounting Fashion: Foot Mount, Flange Mount & Vertical F-flange Mount,
twelve. Input Connection: Cyclo Integral Motor, Hollow Enter Shaft Adapter
thirteen. Coupling Method With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
fourteen. Cycloid reducer Ability Range: .37kW ~ 11kW
2. CZPT parameters
Kind | Outdated Kind | Output Torque | Output Shaft Dia. |
SXJ00 | JXJ00 | 98N.m | φ30 |
SXJ01 | JXJ01 | 221N.m | φ35 |
SXJ02 | JXJ02 | 448N.m | φ45 |
SXJ03 | JXJ03 | 986N.m | φ55 |
SXJ04 | JXJ04 | 1504N.m | φ70 |
SXJ05 | JXJ05 | 3051N.m | φ90 |
SXJ06 | JXJ06 | 5608N.m | φ100 |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned army mould organization, was proven in 1965. CZPTshine specializes in the comprehensive electrical power transmission resolution for large-end gear producing industries dependent on the purpose of “System Item, Software Design and Specialist Provider”.
CZPTshine have a powerful complex power with above 350 staff at current, which includes more than thirty engineering professionals, 30 top quality inspectors, masking an location of 80000 square meters and sorts of CZPTd processing machines and screening equipments. We have a very good foundation for the sector software advancement and services of large-stop velocity reducers & variators proudly owning to the provincial engineering engineering investigation centre,the lab of equipment velocity reducers, and the base of modern day R&D.
Our Staff
High quality Management
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
product is a product inspection to determine the qualified products.
seven. Certification.
Packing
Shipping