Nmrv Series Worm Gearbox with Speed Variator

Nmrv Series Worm CZPT with Speed Variator

RV collection Attributes

  • RV – Dimensions:030-040-050-063-075-a hundred and five-110-130-one hundred fifty
  • Enter Possibilities: with input shaft, With Square flange,With Enter Flange
  • Input Electrical power .06 to 11 kW
  • RV-Dimension from 030 to 105 in die-solid aluminium alloy budy and more than 110 in solid iron
  • Ratios among five and 100
  • Max torque 1550 N.m and admissible output radial masses max 8771 N
  • Aluminium models are provided total with artificial oil and permit for universal mounting positions, with no want to modify lubricant amount
  • Worm wheel: Copper (KK Cu). 
  • Loading capability in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Measurement 030 and more than are painted with RAL 5571 blue
  • Worm equipment reducers are CZPT with diffferent mixtures: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Possibilities: torque arm, output flange, viton oil seals, reduced/substantial temperature oil, filling/drain/breather/amount plug,Small hole

Basic versions can be used to a broad assortment of electrical power reduction ratios from five to a thousand.
Guarantee: One year from day of supply.

 

WORM GEARBOX          
SNW SERIES          Output Velocity Range:
Variety Previous Sort Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Applicable Motor Energy:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Input Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Enter Options2:
SNW090  RV090  410N.m  φ35   With Sq. flange
SNW105  RV105  630N.m  φ42   Enter Options3:
SNW110  RV110  725N.m  φ42   With Enter Shaft
SNW130  RV130  1050N.m  φ45   Enter Options4:
SNW150  RV150  1550N.m  φ50   With Enter Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned military mould organization, was proven in 1965. CZPTshine specializes in the full energy transmission answer for higher-finish products producing industries dependent on the purpose of “System Item, Application Design and Expert Services”.
CZPTshine have a sturdy technological drive with above 350 workers at present, including over thirty engineering professionals, 30 top quality inspectors, masking an location of 80000 sq. meters and sorts of CZPTd processing machines and screening equipments. We have a very good basis for the business software advancement and service of high-stop velocity reducers & variators possessing to the provincial engineering engineering research heart,the lab of equipment pace reducers, and the base of modern day R&D.

Our Staff

Quality Control
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Shipping

 

Nmrv Series Worm CZPT with Speed Variator