Nmrv030 0.55kw Worm Gearbox with Speed Variator

Nmrv030 0.55kw Worm CZPT with Speed Variator

JWB Series Velocity Variator 
1. Functions:

 JWB-X  type

  • Sizes: ≥04
  • Power up to 1.5 kW or more
  • Instances in RAL 5571 blue forged iron
  • Shafts: scenario hardened and tempered metal.
  • Inner components: heat-handled steel
  • Output speed with 4 pole(1400r/min) motors: 2-10r/min4.7-23.5r/min15-75r/min20-100r/min, 28-140r/min, 30-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
  • Output Torque worth max 1002Nm
  • CZPT, vibration-cost-free operating
  • Bidirectional rotation
  • Handle handwheel positionable on either facet
  • Slipping velocity to max load at 5% 
  • Regulation sensibility: ,5 rpm 
  • Painted with blue epoxy-polyester powder 

 JWB-X B sort

  • Dimensions:01,02,03 and 04
  • Electrical power up to 1.5 kW or much less
  • Situations in die-forged aluminium alloy
  • Shafts: circumstance hardened and tempered steel.
  • Internal factors: warmth-dealt with steel
  • Output pace with four pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.5-32.5r/min, 8-40r/min, nine-45r/min, 13-65r/min, 15r/min-75r/min18-90r/min, 25-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
  • Output Torque value max 795 Nm
  • CZPT, vibration-totally free managing
  • Bidirectional rotation
  • Handle hand wheel positionable on either facet
  • Slipping pace to max load at five%
  • Regulation sensibility: ,5 rpm
  • Painted with blue epoxy-polyester powder 

2. CZPT parameters

 

Kind Output Torque Output Shaft Dia.   Output Speed Selection 2rpm-950rpm
SWB01 2.six-1.6N.m φ11 Relevant Motor Energy .18kW-7.5kW
SWB02 258-one.8N.m φ14,φ24,φ28,φ32  
SWB03 426-4N.m φ24,φ28,φ38 Input Alternatives With Inline AC Motor
SWB04 795-8N.m φ28,φ38,φ42 With IEC Motor
SWB05 535-16N.m φ38,φ48,φ55 With Input Shaft
SWB06 1002-40N.m φ42,φ55,φ70 With Enter Flange

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould organization, was established in 1965. CZPTshine specializes in the total electrical power transmission remedy for substantial-finish products production industries dependent on the goal of “System Item, Application Layout and Specialist Support”.
CZPTshine have a sturdy technological power with above 350 staff at current, including in excess of 30 engineering professionals, 30 high quality inspectors, masking an area of 80000 sq. meters and types of CZPTd processing devices and screening equipments. We have a great foundation for the sector application growth and provider of high-stop pace reducers & variators possessing to the provincial engineering engineering study center,the lab of equipment pace reducers, and the foundation of present day R&D.

Our Staff

Top quality Manage
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
item is a product inspection to determine the qualified products.

seven. Certification.

Packing

Delivery

Nmrv030 0.55kw Worm CZPT with Speed Variator