Nmrv050 Worm Gearbox for Industry

Nmrv050 Worm CZPT for CZPT

RV sequence Qualities

  • RV – Measurements:030-040-050-063-075-105-110-a hundred thirty-150
  • Input Possibilities: with enter shaft, With Square flange,With Input Flange
  • Enter Electrical power .06 to 11 kW
  • RV-Dimensions from 030 to 105 in die-solid aluminium alloy budy and more than a hundred and ten in solid iron
  • Ratios among 5 and one hundred
  • Max torque 1550 N.m and admissible output radial masses max 8771 N
  • Aluminium units are supplied full with artificial oil and permit for universal mounting positions, with no need to have to modify lubricant quantity
  • Worm wheel: Copper (KK Cu). 
  • Loading ability in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Measurement 030 and over are painted with RAL 5571 blue
  • Worm equipment reducers are CZPT with diffferent combinations: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Possibilities: torque arm, output flange, viton oil seals, reduced/substantial temperature oil, filling/drain/breather/stage plug,Little hole

Basic types can be applied to a wide variety of electricity reduction ratios from 5 to a thousand.
Warranty: One year from date of shipping and delivery.

 

WORM GEARBOX          
SNW SERIES          Output Velocity Selection:
Sort Previous Kind Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Applicable Motor Energy:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Input Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Enter Options2:
SNW090  RV090  410N.m  φ35   With Sq. flange
SNW105  RV105  630N.m  φ42   Enter Options3:
SNW110  RV110  725N.m  φ42   With Input Shaft
SNW130  RV130  1050N.m  φ45   Enter Options4:
SNW150  RV150  1550N.m  φ50   With Input Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned navy mould business, was set up in 1965. CZPTshine specializes in the total energy transmission answer for substantial-end gear manufacturing industries primarily based on the aim of “System Merchandise, Software Design and style and Skilled Service”.
CZPTshine have a powerful technological drive with above 350 workers at existing, including in excess of thirty engineering professionals, 30 top quality inspectors, masking an location of 80000 square meters and types of CZPTd processing machines and tests equipments. We have a excellent foundation for the industry application advancement and service of higher-end velocity reducers & variators proudly owning to the provincial engineering technological innovation investigation center,the lab of gear speed reducers, and the base of contemporary R&D.

Our Staff

High quality Manage
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Shipping and delivery

Nmrv050 Worm CZPT for CZPT