Nmrv075 Worm Gearbox with Output Flange

Nmrv075 Worm CZPT with Output Flange

RV collection Qualities

  • RV – Sizes:030-040-050-063-075-one zero five-a hundred and ten-one hundred thirty-one hundred fifty
  • Input Alternatives: with enter shaft, With Sq. flange,With Input Flange
  • Enter Electricity .06 to 11 kW
  • RV-Measurement from 030 to 105 in die-forged aluminium alloy budy and above a hundred and ten in forged iron
  • Ratios between 5 and one hundred
  • Max torque 1550 N.m and admissible output radial masses max 8771 N
  • Aluminium models are equipped full with artificial oil and let for common mounting positions, with no need to modify lubricant quantity
  • Worm wheel: Copper (KK Cu). 
  • Loading capability in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Dimension 030 and over are painted with RAL 5571 blue
  • Worm equipment reducers are CZPT with diffferent mixtures: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Options: torque arm, output flange, viton oil seals, minimal/large temperature oil, filling/drain/breather/degree plug,Small gap

Simple models can be applied to a broad range of power reduction ratios from 5 to one thousand.
Guarantee: One year from day of supply.

 

WORM GEARBOX          
SNW SERIES          Output Pace Range:
Type Outdated Sort Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Relevant Motor Power:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Input Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Enter Options2:
SNW090  RV090  410N.m  φ35   With Square flange
SNW105  RV105  630N.m  φ42   Enter Options3:
SNW110  RV110  725N.m  φ42   With Enter Shaft
SNW130  RV130  1050N.m  φ45   Enter Options4:
SNW150  RV150  1550N.m  φ50   With Enter Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned military mould enterprise, was recognized in 1965. CZPTshine specializes in the total electricity transmission resolution for high-end products production industries primarily based on the goal of “System Merchandise, Application Layout and Skilled Services”.
CZPTshine have a robust technological force with more than 350 staff at current, such as in excess of thirty engineering experts, 30 top quality inspectors, covering an area of 80000 square meters and varieties of CZPTd processing machines and testing equipments. We have a good basis for the business software development and provider of high-stop speed reducers & variators proudly owning to the provincial engineering technology investigation centre,the lab of gear velocity reducers, and the base of modern day R&D.

Our Staff

Good quality Handle
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Supply

Nmrv075 Worm CZPT with Output Flange