R Series High Quality Starshine Agricultural Gearbox

R Series High Quality CZPT Agricultural CZPT

R series CZPTcal Geared Motor Traits

one. Functions:

one. High effectiveness: 92%-97%

 

2. Compact composition: Tiny offset output, two stage and three stage are in the very same box.

 

3. High precision: the equipment is manufactured of large-good quality alloy steel forging, carbonitriding and hardening therapy, grinding approach to make certain high precision and secure operating.

four. High interchangeability: highly modular, serial layout, sturdy flexibility and interchangeability.

two. CZPT parameters

Ratio three.forty one-289.seventy four
Enter energy .12-160KW
Output torque sixty one-23200N.m
Output velocity 5-415rpm
Mounting type Foot mounted, flange mounted, foot and flange mounted, one-phase foot mounted, solitary stage flange mounted, Flange-mounted with extended bearing hub
Input Method Flange input(AM), shaft input(Ad), inline AC motor enter, or AQA servo motor
Brake Launch HF-guide release(lock in the brake launch situation), HR-handbook launch(autom-atic braking situation)
Thermistor TF(Thermistor security PTC thermisto)
TH(Thermistor security Bimetal swotch)
Mounting Situation M1, M2, M3, M4, M5, M6
Type R17-R167
Output shaft dis. 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm
Housing material HT200 large-toughness cast iron from R37,forty seven,57,sixty seven,seventy seven,87
Housing content HT250 Large toughness forged iron from R97 107,137,147,157,167,187
Heat treatment technology carbonitriding and hardening treatment method
Performance 92%-ninety seven%
Lubricant VG220
Security Course IP55, F class

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned armed forces mould business, was proven in 1965. CZPTshine specializes in the comprehensive energy transmission resolution for higher-finish tools manufacturing industries based on the goal of “System Product, Software Design and style and Professional Service”.
CZPTshine have a powerful specialized pressure with more than 350 staff at existing, like more than 30 engineering experts, 30 top quality inspectors, covering an spot of 80000 sq. meters and types of CZPTd processing machines and screening equipments. We have a good foundation for the market software advancement and service of higher-finish pace reducers & variators proudly owning to the provincial engineering technological innovation analysis centre,the lab of equipment velocity reducers, and the foundation of contemporary R&D.

Our Group

Quality Control
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
product is a product inspection to determine the qualified products.

7. Certification.

Packing

Shipping

R Series High Quality CZPT Agricultural CZPT