RV Series Hole Input and Shaft Output Worm Reducer

RV Series Hole Input and Shaft Output Worm Reducer

 

Solution Description

Major Characteristics:
one) Manufactured of large high quality aluminum alloy, gentle excess weight and non-rusting
two) Massive output torque and substantial radiating efficiency
three) Clean operating and minimal noise, can operate prolonged time in dreadful condition
4) Very good-hunting physical appearance, tough support existence and little volume
5) Suitable for omnibearing installation
Main Supplies:
one)housing:aluminium alloy ADC12(size 571-090) die forged iron HT200(size one hundred ten-a hundred and fifty)
two)Worm:20Cr, ZI Involute profile carbonize&quencher heat remedy make equipment surface area hardness up to fifty six-sixty two HRC Soon after precision grinding, carburization layer’s thickness amongst .3-.5mm.
three)Worm Wheel:wearable stannum alloy CuSn10-one
Mix Possibilities:
Input:with enter shaft, With square flange,With IEC regular input flange
Output:with torque arm, output flange, one output shaft, double output shaft, plastic cover
Worm reducers are CZPT with diffferent mixtures: NMRV+NMRV, NMRV+NRV, NMRV+Personal computer, NMRV+UDL, NMRV+MOTORS

Comprehensive Photographs

Product Parameters

 Old Model        New Model     Ratio     Center Distance  Power Input Dia.  Output Dia.    Output Torque Excess weight
RV571     7.five~100   25mm   .06KW~.12KW  Φ9 Φ11 21N.m  .7kgs
RV030 RW030 seven.five~100 30mm   .06KW~.25KW Φ9(Φ11) Φ14 45N.m  1.2kgs
RV040 RW040 seven.5~one hundred 40mm   .09KW~.55KW Φ9(Φ11,Φ14) Φ18(Φ19) 84N.m  two.3kgs
RV050 RW050 seven.five~100 50mm   .12KW~1.5KW Φ11(Φ14,Φ19) Φ25(Φ24) 160N.m  three.5kgs
RV063 RW063 7.five~100 63mm   .18KW~two.2KW Φ14(Φ19,Φ24) Φ25(Φ28) 230N.m  six.2kgs
RV075 RW075 seven.5~a hundred 75mm   .25KW~4.0KW Φ14(Φ19,Φ24,Φ28)  Φ28(Φ35) 410N.m  9.0kgs
RV090 RW090 seven.5~100 90mm   .37KW~four.0KW Φ19(Φ24,Φ28) Φ35(Φ38) 725N.m  thirteen.0kgs
RV110 RW110 7.5~one hundred 110mm   .55KW~seven.5KW Φ19(Φ24,Φ28,Φ38)   Φ42 1050N.m  35.0kgs
RV130 RW130 7.5~a hundred 130mm   .75KW~7.5KW Φ24(Φ28,Φ38) Φ45 1550N.m  forty eight.0kgs
RV150 RW150 7.5~one hundred 150mm     2.2KW~15KW Φ28(Φ38,Φ42) Φ50   eighty four.0kgs

Exploded See:

GMRV Outline Dimension:

GMRV A B C C1 D(H8) E(h8) F G G1 H H1 I M N O P Q R S T BL β b t V  
030 80 97 54 44 fourteen fifty five 32 56 63 65 29 55 40 fifty seven thirty 75 44 6.five 21 five.5 M6*10(n=four) five 16.3 27
040 one hundred 121.five 70 60 eighteen(19) sixty 43 71 seventy eight seventy five 36.five 70 fifty seventy one.5 forty 87 55 six.five 26 six.five M6*10(n=4) 45° six twenty.eight(21.8) 35
050 a hundred and twenty one hundred forty four 80 70 twenty five(24) 70 49 85 92 eighty five 43.5 80 60 eighty four fifty a hundred sixty four eight.five thirty seven M8*twelve(n=4) 45° 8 28.3(27.three) 40
063 one hundred forty four 174 a hundred 85 twenty five(28) eighty sixty seven 103 112 95 fifty three 95 seventy two 102 63 one hundred ten 80 8.five 36 eight M8*12(n=8) 45° eight 28.3(31.three) 50
075 172 205 a hundred and twenty ninety 28(35) ninety five seventy two 112 one hundred twenty one hundred fifteen 57 112.5 86 119 seventy five 140 93 eleven forty ten M8*fourteen(n=eight) 45° 8(10) 31.three(38.three) sixty
090 206 238 a hundred and forty 100 35(38) 110 74 130 a hundred and forty 130 sixty seven 129.5 103 135 90 160 102 13 45 11 M10*16(n=8) 45° 10 38.3(forty one.three) 70
one hundred ten 255 295 one hundred seventy a hundred and fifteen 42 130 144 one hundred fifty five 165 seventy four a hundred and sixty 127.five 167.five one hundred ten 200 a hundred twenty five fourteen 50 fourteen M10*18(n=eight) 45° twelve 45.3 eighty five
130 293 335 two hundred a hundred and twenty 45 one hundred eighty one hundred fifty five a hundred and seventy 215 eighty one 179 146.five 187.5 one hundred thirty 250 one hundred forty 16 sixty 15 M12*twenty(n=8) 45° fourteen 48.8 one hundred
150 340 four hundred 240 one hundred forty five fifty one hundred eighty 185 200 215 96 210 one hundred seventy 230 150 250 180 18 72.five 18 M12*22(n=eight) 45° fourteen fifty three.eight  120  

Firm Profile

About CZPT Transmission:
We are a professional reducer manufacturer positioned in HangCZPT, ZHangCZPTg province.
Our major goods is  full variety of RV571-one hundred fifty worm reducers , also provided GKM hypoid helical gearbox, GRC inline helical gearbox, Pc models, UDL Variators and AC Motors, G3 helical gear motor.
Goods are broadly utilized for applications such as: foodstuffs, ceramics, packing, chemical compounds, pharmacy, plastics, paper-creating, development machinery, metallurgic mine, environmental defense engineering, and all kinds of computerized lines, and assembly strains.
With quickly shipping, excellent right after-revenue service, CZPTd making facility, our items market well  both at home and overseas. We have exported our reducers to Southeast Asia, CZPT CZPTpe and the Center CZPT and so on.Our goal is to build and innovate on the foundation of high top quality, and produce a good track record for reducers.
Workshop:

Exhibitions:
We take part Germany Hannver Exhibition-ZheCZPT PTC Honest-Turkey Get Eurasia

Packaging & Shipping and delivery

  Packing information:CZPT Luggage+Cartons+Wood Cases , or on request

Set up Instructions

To put in the reducer, it is required to notice the adhering to troubles:
one)Verify the correct rotation direction of output shaft prior to fitting reducer to devices.
two)Just before mounting, pls examine shaft diameter, bore diameter, important and keyway, to be positive their dimension are not deviation In purchase to hold good efficiency, also pls stay away from assembling also restricted or way too unfastened. 
3)Reducer need to be mounted to equipment stably to keep away from vibration.
4)Each time achievable,protect the reducer against photo voltaic radiation and poor temperature.
five)In the situation of specifically lengthy period of storage(four-6 months), if the oil seal is not immersed in lubricant inside the unit, it is recommended to change it because the rubber could adhere to the shaft or may even have misplaced the elasticity.
6)Portray have to certainly not go in excess of rubber elements and the holes on breather plug if any.
7)When connect with hollow or reliable shaft, pls grease the joint to avoid lock or oxidation.
eight)Examine the appropriate lubricant stage by means of indicator if there is a single.
9)CZPTting need to consider spot progressively, CZPT quickly implementing the maximum load.
ten)When utilizing various of motors to match reducer directly, supporting unit is necessary if motor is as well large.
11)Guarantee excellent heat dissipation by keeping great air flow near the motor supporter.
twelve)In the circumstance of ambient temperature40ºC, pls get in touch with the technical department.

Following Sales Services

one.Maintenance Time and Guarantee:Within a single 12 months following getting products.
two.Other SupportWhich includes modeling variety guide, installation guide, and difficulty resolution guidebook, etc.

FAQ

1.Q:Can you make as for every buyer drawing?
   A: Yes, we offer CZPT services for buyers appropriately. We can use customer’s nameplate for gearboxes.
2.Q:What is your conditions of payment ?
   A: 30% deposit just before production,stability T/T just before shipping.
3.Q:Are you a trading company or producer?
   A:We are a manufacurer with CZPTd equipment and knowledgeable staff.
4.Q:What is your production capacity?
   A:8000-9000 PCS/Thirty day period
5.Q:Cost-free sample is CZPT or not?
   A:Yes, we can offer cost-free sample if client agree to pay for the courier cost
six.Q:Do you have any certificate?
   A:Sure, we have CE certification and SGS certification report.

Make contact with information:
Ms Lingel Pan
For any queries just truly feel cost-free ton contact me. Several thanks for your sort focus to our company!

RV Series Hole Input and Shaft Output Worm Reducer