RV030 0.75kw Series Worm Gear Box for Packing Machine

RV030 0.75kw Series Worm Gear Box for Packing CZPT

RV series Attributes

  • RV – Dimensions:030-040-050-063-075-one hundred and five-a hundred and ten-a hundred thirty-a hundred and fifty
  • Enter Alternatives: with input shaft, With Square flange,With Enter Flange
  • Enter Electrical power .06 to 11 kW
  • RV-Dimensions from 030 to 105 in die-solid aluminium alloy budy and above a hundred and ten in solid iron
  • Ratios in between five and one hundred
  • Max torque 1550 N.m and admissible output radial loads max 8771 N
  • Aluminium units are equipped full with artificial oil and allow for universal mounting positions, with no want to modify lubricant amount
  • Worm wheel: Copper (KK Cu). 
  • Loading ability in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Dimension 030 and over are painted with RAL 5571 blue
  • Worm gear reducers are CZPT with diffferent combinations: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Alternatives: torque arm, output flange, viton oil seals, lower/higher temperature oil, filling/drain/breather/stage plug,Little gap

Simple designs can be utilized to a vast selection of power reduction ratios from five to a thousand.
Warranty: One year from day of supply.

 

WORM GEARBOX          
SNW SERIES          Output Speed Variety:
Sort Old Type Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Applicable Motor Electrical power:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Input Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Input Options2:
SNW090  RV090  410N.m  φ35   With Sq. flange
SNW105  RV105  630N.m  φ42   Enter Options3:
SNW110  RV110  725N.m  φ42   With Input Shaft
SNW130  RV130  1050N.m  φ45   Enter Options4:
SNW150  RV150  1550N.m  φ50   With Enter Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned army mould company, was proven in 1965. CZPTshine specializes in the total energy transmission answer for high-end products production industries based mostly on the intention of “System Item, Application Design and Professional Service”.
CZPTshine have a robust technological pressure with above 350 employees at existing, which includes more than 30 engineering technicians, thirty top quality inspectors, masking an location of 80000 sq. meters and varieties of CZPTd processing devices and testing equipments. We have a very good foundation for the industry software growth and services of large-stop speed reducers & variators possessing to the provincial engineering technologies study center,the lab of gear speed reducers, and the base of modern R&D.

Our Group

Quality Manage
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Delivery

RV030 0.75kw Series Worm Gear Box for Packing CZPT