Very High Speed Reduction Ratios Gearbox

Very High Speed Reduction Ratios CZPT

CZPTshine CZPT Cycloid Geared Motor Characteristics

one. Attributes:
one. Smooth managing,low sounds equipment tooth needle a lot more engagement.
two. Cycloidal tooth profile gives a substantial contact ratio to face up to overload shocks
3. Compact dimension: solitary ratio CZPT from one/9 to one/87, double phase up from 1/99 to 1/7569 
4. Best for dynamic programs: repeated begin-stop-reversing duties suits for cyclo speed reducer because inertia is low
five. Lessen maintenance charges: substantial dependability, prolonged lifestyle, minimal upkeep when compared to standard gearboxes
six. Internal areas replaceable with other manufacturers to ensure operating.

7. Grease Lubricated & Oil Lubricated Designs Obtainable
eight. Output Shaft Rotation Path: Single Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
9. Ambient Problems: Indoor Set up:ten-forty Celsius, Max 85% Humidity, Under 1000m Altitude, Nicely Ventilated Environment, Cost-free of corrosive,        explosive gases, vapors and dust
10.Gradual Velocity Shaft Route: Horizontal, Vertical Up & Down, CZPT Path
eleven.Mounting Design: Foot Mount, Flange Mount & Vertical F-flange Mount,
twelve. Input Link: Cyclo Integral Motor, Hollow Input Shaft Adapter
thirteen. Coupling Approach With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
14. Cycloid reducer Capacity Variety: .37kW ~ 11kW

2. CZPT parameters

Variety Aged Variety Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned military mould organization, was recognized in 1965. CZPTshine specializes in the total electricity transmission answer for large-finish tools producing industries dependent on the goal of “System Item, Application Design and style and Professional Provider”.
CZPTshine have a strong technological pressure with in excess of 350 personnel at current, which includes in excess of 30 engineering specialists, thirty top quality inspectors, covering an area of 80000 sq. meters and sorts of CZPTd processing equipment and testing equipments. We have a excellent foundation for the sector software development and services of high-conclude pace reducers & variators proudly owning to the provincial engineering technologies investigation center,the lab of equipment pace reducers, and the foundation of contemporary R&D.

Our Crew

Good quality Control
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
item is a product inspection to determine the qualified products.

7. Certification.

Packing

Supply

 

Very High Speed Reduction Ratios CZPT