Z 20 Bevel Gear

Z 20 Bevel Gear

Item Description: 
Z 20 Bevel Gear 

Primary Functions:
Form and Sort

Kind Material Surface
Therapy
Add-ons
Straight Sort
Straight
Bore
Straight
Bore+Tap
Keyway+Faucet
SM SMT KSMT 1045
Carbon Metal
Established CZPT
(4137 Alloy Metal Black Oxide)
SAM SAMT KSAMT Black Oxide
SB SBT KSBT  
SUM SUMT KSUMT 304
Stainless Metal
Set CZPT(304 Stainless Steel
CZPT CZPTT KCZPTT  Nickel Plating  
SUB SUBT KSUBT    

Bevel Equipment
1. Make strictly in accordance with ANSI or DIN normal dimension
2. Substance: SCM 415 steel, SUS 304
three. Bore: Finished bore

Product name Bevel Equipment
Materials Available Stainless Steel, Carbon Steel or as your design
BORE Concluded bore, Pilot Bore, Particular ask for
Processing Method Molding, Shaving, Hobbing, Drilling, Tapping, Reaming, Guide Chamfering, Grinding etc
Stress Angle twenty Degree
Hardness 194HB or significantly less
Size CZPTer Drawings & ISO common
Deal Wood Situation/Container and pallet, or produced-to-get
Certificate CZPT:2008
Lead Time In 30 times soon after get your payment

Specification:

Element Quantity Shaft Bore Dia. PH7(1mm Increment) Quantity
of Enamel
J B C D E F G H
Type Module Straight Bore
Straight Bore+Tap
Keyway+Faucet
Straight Bore
SM, SAM, SB
SUM, CZPT, SUB

Straight Bore+Faucet
SMT, SAMT, SBT
SUMT, CZPTT
SUBT

Keyway+Tap
KSMT, KSAMT, KSBT
KSUMT, KCZPTT
KSUBT

1. 6 eight twenty four.three sixteen twenty 21.forty one 21 14.fifty three eleven.seventy one 9
6 eight, 10 twenty five five.3 twenty twenty five 26.41 23 fourteen.seven eleven.21 eight
eight eight, 10, 12 30 six.2 22 30 31.41 26 fifteen.89 11.71 8.9
one.twenty five eight ten twenty 6 22 twenty five 26.seventy seven 23 fifteen.27 11.38 9
8 10, twenty five seven twenty five 31.twenty five 33.02 28 17.88 13.26 nine.twenty five
ten 10, 12, 14 30 eight 30 37.five 39.27 36 23.forty seven eighteen.thirteen 13.five
one.five 10 10, 12 twenty 6.eight 24 thirty 32.12 28 eighteen.53 fourteen.06 ten
ten 10~14 twenty five seven.five 30 37.5 39.62 34 21.26 16.31 eleven.five
twelve twelve~sixteen thirty nine.3 33 forty five 47.12 38 22.83 16.56 twelve.34
two. ten 12 sixteen 7 27 32 34.eighty three 30 19 15.41 11.5
12 twelve~fourteen 20 8.5 34 40 forty one.32 37 24 18.41 14
twelve twelve~sixteen twenty five 10.5 forty two fifty 51.33 forty 23.34 sixteen.41 ten.99
twelve 12~eighteen thirty 12.4 44 60 sixty one.36 51 thirty.77 22.forty one sixteen.seventy nine
2.5 12 fourteen 16 nine 34 forty 43.fifty three 35 21 16.seventy seven twelve
14 14,sixteen 20 twelve forty two 50 fifty three.54 48 32.fifty four 24.seventy seven 19
sixteen 16~ 25 15 fifty sixty two.5 66.04 fifty 30.41 twenty.52 twelve.five
16 16~ 30 fifteen sixty seventy five 78.54 sixty two 36.28 26.27 seventeen
three 14 sixteen 16 11 forty two forty eight fifty two.24 forty 23 eighteen.12 13
sixteen 16~ 20 fifteen 50 60 64.24 58 39.eighty four thirty.twelve 23
20 20~ twenty five twenty 60 75 79.24 60 37.81 24.62 fifteen
20 20~ 30 20 70 ninety 94.24 75 forty five.47 32.12 20

Packaging and Shipping and delivery:

Packaging Polyethylene bag or oil paper for each and every item
Pile on carton or as customer’s demand
Delivery of Samples By DHL, Fedex, UPS,  TNT, EMS
Lead time ten-fifteen functioning times as typical, 30days in occupied time, it will based on the comprehensive get quantity.

FAQ:

Principal Markets? North CZPTica, South CZPTica, CZPT CZPTpe , West CZPTpe , North CZPTpe, South CZPTpe, Asia
How to purchase? * You deliver us drawing or sample
* We carry via project assessment
* We give you our layout for your affirmation
* We make the sample and send it to you right after you verified our layout
* You affirm the sample then area an purchase and shell out us thirty% deposit
* We commence generating
* When the merchandise is done, you pay us the balance soon after you verified photos or tracking figures.
* Trade is done, thank you!!

Payment:  T/T
If you are fascinated in our merchandise, remember to tell us which resources, type, width, duration u want.

Z 20 Bevel Gear